Back to Library
Library mission story

STS-133

Leonardo Becomes Permanent on Discovery's Final Flight

STS-133 carried the Permanent Multipurpose Module Leonardo, supplies, Robonaut 2, and an external logistics carrier to the ISS on Space Shuttle Discovery's final mission.

Mission type

Crewed Space Shuttle logistics mission

Launch

February 24, 2011

Mission end / docking

March 9, 2011

Launch vehicle / spacecraft

Space Shuttle Discovery

Why this mission belongs in the Library: STS-133 is part of the International Space Station assembly story. This record connects the mission objective and flight sequence to the specific station hardware it delivered or activated: Permanent Multipurpose Module Leonardo, ELC-4, Robonaut 2, supplies.

Objective

What this ISS mission set out to accomplish

Convert a previously reusable logistics module into permanent station volume, deliver external spare-equipment storage, and resupply the ISS during Discovery's final flight.

This record treats STS-133 as an assembly or station-support mission rather than as a satellite engineering page, keeping the mission objective separate from the hardware-level ISS engineering record.

Flight and rendezvous

How the mission reached and worked at the station

STS-133 launched on February 24, 2011 using Space Shuttle Discovery from Kennedy Space Center, Launch Pad 39A.

Leonardo had been modified from a Multi-Purpose Logistics Module into a permanent module. Station robotics removed it from Discovery and attached it to Unity while crews transferred equipment and completed external work.

Hardware and assembly

What was delivered, installed, or reconfigured

Primary hardware or assembly focus: Permanent Multipurpose Module Leonardo, ELC-4, Robonaut 2, supplies.

Installation record: Leonardo installed permanently on the station during STS-133. This is the engineering connection between the mission story and the interactive International Space Station breakdown.

Outcome

What changed on the International Space Station

Leonardo became permanent pressurized storage and research-support volume. STS-133 also closed Space Shuttle Discovery's flight career after decades of service.

The documented result makes STS-133 part of the larger ISS assembly chain, where individual missions progressively added structure, power, laboratories, robotics, thermal control, logistics, and crew-support systems.