Back to Library
Library mission story

STS-97

P6 Truss and the Station's First Large U.S. Solar Arrays

STS-97 carried the P6 Integrated Truss Segment and its solar arrays to the ISS, dramatically increasing the electrical power available to the growing orbital laboratory.

Mission type

Crewed Space Shuttle assembly mission

Launch

November 30, 2000

Mission end / docking

December 11, 2000

Launch vehicle / spacecraft

Space Shuttle Endeavour

Why this mission belongs in the Library: STS-97 is part of the International Space Station assembly story. This record connects the mission objective and flight sequence to the specific station hardware it delivered or activated: P6 Integrated Truss Segment, solar arrays, batteries, and power hardware.

Objective

What this ISS mission set out to accomplish

Increase station electrical-generation and energy-storage capability by delivering the P6 truss with photovoltaic arrays, batteries, and associated power-distribution hardware.

This record treats STS-97 as an assembly or station-support mission rather than as a satellite engineering page, keeping the mission objective separate from the hardware-level ISS engineering record.

Flight and rendezvous

How the mission reached and worked at the station

STS-97 launched on November 30, 2000 using Space Shuttle Endeavour from Kennedy Space Center, Launch Pad 39B.

P6 was launched as a large integrated package in Endeavour's payload bay. Robotic operations and spacewalks attached the truss, connected utilities, and deployed the long photovoltaic wings.

Hardware and assembly

What was delivered, installed, or reconfigured

Primary hardware or assembly focus: P6 Integrated Truss Segment, solar arrays, batteries, and power hardware.

Installation record: P6 truss installed in December 2000. This is the engineering connection between the mission story and the interactive International Space Station breakdown.

Outcome

What changed on the International Space Station

The new arrays provided the power needed for the expanding U.S. segment and became a major early milestone in the station's eventual full truss-and-solar-array architecture.

The documented result makes STS-97 part of the larger ISS assembly chain, where individual missions progressively added structure, power, laboratories, robotics, thermal control, logistics, and crew-support systems.

TransitSatellite connections

Related missions, rockets & people

Continue exploring

Explore more about STS-97

Books, audiobooks, and resources connected to this story. Follow an individual account or explore the wider history.

Affiliate links. As an Amazon Associate I earn from qualifying purchases. TransitSatellite may earn a commission when you buy through these links.

Affiliate recommendation · Related reading

Shuttle, Houston: My Life in the Center Seat of Mission Control

By Paul Dye

A Space Shuttle flight director describes mission planning, training and decisions in Mission Control. This program-wide memoir supplies operational context for the Shuttle vehicles and their International Space Station assembly flights.

As an Amazon Associate I earn from qualifying purchases. Check the exact item, edition, seller and price on Amazon. A purchase is optional.

Affiliate recommendation · Models & STEM

ROKR Space Shuttle 3D Wooden Puzzle Building Model

A detailed moving space-shuttle building model designed for hands-on assembly and display.

As an Amazon Associate I earn from qualifying purchases. Check the exact item, edition, seller and price on Amazon. A purchase is optional.