Back to Library
Library mission story

STS-123

Kibo Assembly Begins and Dextre Arrives

STS-123 delivered the first pressurized Kibo element and Canada's Dextre robotic manipulator, beginning Japan's multi-flight laboratory assembly sequence.

Mission type

Crewed Space Shuttle assembly mission

Launch

March 11, 2008

Mission end / docking

March 26, 2008

Launch vehicle / spacecraft

Space Shuttle Endeavour

Why this mission belongs in the Library: STS-123 is part of the International Space Station assembly story. This record connects the mission objective and flight sequence to the specific station hardware it delivered or activated: Kibo Experiment Logistics Module–Pressurized Section and Dextre.

Objective

What this ISS mission set out to accomplish

Begin assembly of Japan's Kibo laboratory complex and deliver the Canadian Special Purpose Dexterous Manipulator for fine external maintenance work.

This record treats STS-123 as an assembly or station-support mission rather than as a satellite engineering page, keeping the mission objective separate from the hardware-level ISS engineering record.

Flight and rendezvous

How the mission reached and worked at the station

STS-123 launched on March 11, 2008 using Space Shuttle Endeavour from Kennedy Space Center, Launch Pad 39A.

Endeavour carried two major international elements. Station robotics and multiple spacewalks installed the Kibo logistics section and assembled Dextre from launch components on the station exterior.

Hardware and assembly

What was delivered, installed, or reconfigured

Primary hardware or assembly focus: Kibo Experiment Logistics Module–Pressurized Section and Dextre.

Installation record: Kibo logistics module installed in March 2008. This is the engineering connection between the mission story and the interactive International Space Station breakdown.

Outcome

What changed on the International Space Station

The first Kibo pressurized element was attached and Dextre became part of the station's robotics system, setting up the next Kibo construction flights.

The documented result makes STS-123 part of the larger ISS assembly chain, where individual missions progressively added structure, power, laboratories, robotics, thermal control, logistics, and crew-support systems.