Back to Library
Library mission story

STS-117

S3/S4 Truss and a Third Major Solar-Array Set

STS-117 installed the S3/S4 truss and deployed a new starboard photovoltaic array set while reconfiguring older P6 power hardware.

Mission type

Crewed Space Shuttle assembly mission

Launch

June 8, 2007

Mission end / docking

June 22, 2007

Launch vehicle / spacecraft

Space Shuttle Atlantis

Why this mission belongs in the Library: STS-117 is part of the International Space Station assembly story. This record connects the mission objective and flight sequence to the specific station hardware it delivered or activated: S3/S4 truss, Solar Alpha Rotary Joint, photovoltaic arrays.

Objective

What this ISS mission set out to accomplish

Extend the starboard truss, add another major photovoltaic power channel, and continue the electrical reconfiguration needed for the station's completed power architecture.

This record treats STS-117 as an assembly or station-support mission rather than as a satellite engineering page, keeping the mission objective separate from the hardware-level ISS engineering record.

Flight and rendezvous

How the mission reached and worked at the station

STS-117 launched on June 8, 2007 using Space Shuttle Atlantis from Kennedy Space Center, Launch Pad 39A.

The S3/S4 assembly included structural truss sections, the Solar Alpha Rotary Joint, photovoltaic radiator hardware, and deployable solar wings. Spacewalkers released launch restraints and assisted array and power-system configuration.

Hardware and assembly

What was delivered, installed, or reconfigured

Primary hardware or assembly focus: S3/S4 truss, Solar Alpha Rotary Joint, photovoltaic arrays.

Installation record: S3/S4 installed during STS-117. This is the engineering connection between the mission story and the interactive International Space Station breakdown.

Outcome

What changed on the International Space Station

STS-117 substantially increased starboard-side power generation and moved the station closer to its final symmetric truss-and-array configuration.

The documented result makes STS-117 part of the larger ISS assembly chain, where individual missions progressively added structure, power, laboratories, robotics, thermal control, logistics, and crew-support systems.