STS-112

S1 Truss, Thermal Control and the Starboard Backbone

STS-112 delivered the S1 truss, expanding the station's starboard structure and adding thermal-control equipment plus a Crew and Equipment Translation Aid cart.

Mission type

Crewed Space Shuttle assembly mission

Launch

October 7, 2002

Mission end / docking

October 18, 2002

Launch vehicle / spacecraft

Space Shuttle Atlantis

Why this mission belongs in the Library: STS-112 is part of the International Space Station assembly story. This record connects the mission objective and flight sequence to the specific station hardware it delivered or activated: S1 Integrated Truss Segment and CETA Cart A.

Objective

What this ISS mission set out to accomplish

Extend the station's truss to starboard and add cooling, utility, translation, and structural systems required for later power-generation segments.

This record treats STS-112 as an assembly or station-support mission rather than as a satellite engineering page, keeping the mission objective separate from the hardware-level ISS engineering record.

Flight and rendezvous

How the mission reached and worked at the station

STS-112 launched on October 7, 2002 using Space Shuttle Atlantis from Kennedy Space Center, Launch Pad 39B.

The S1 truss was transferred to the station and attached to S0. Spacewalkers connected electrical and ammonia cooling lines, released launch restraints, and outfitted the CETA system and other external hardware.

Hardware and assembly

What was delivered, installed, or reconfigured

Primary hardware or assembly focus: S1 Integrated Truss Segment and CETA Cart A.

Installation record: S1 installed during the October 2002 docked mission. This is the engineering connection between the mission story and the interactive International Space Station breakdown.

Outcome

What changed on the International Space Station

S1 became a permanent part of the Integrated Truss Structure and added key elements of the station's external active thermal-control architecture.

The documented result makes STS-112 part of the larger ISS assembly chain, where individual missions progressively added structure, power, laboratories, robotics, thermal control, logistics, and crew-support systems.