STS-104

Quest Joint Airlock and Independent ISS Spacewalk Capability

STS-104 delivered and installed the Quest Joint Airlock, giving the station a dedicated U.S.-segment facility for spacewalk preparation and extravehicular activity.

Mission type

Crewed Space Shuttle assembly mission

Launch

July 12, 2001

Mission end / docking

July 24, 2001

Launch vehicle / spacecraft

Space Shuttle Atlantis

Why this mission belongs in the Library: STS-104 is part of the International Space Station assembly story. This record connects the mission objective and flight sequence to the specific station hardware it delivered or activated: Quest Joint Airlock and high-pressure gas tanks.

Objective

What this ISS mission set out to accomplish

Give the ISS an independent U.S. airlock capable of supporting station-based spacewalks and servicing both U.S. and compatible Russian spacesuit operations.

This record treats STS-104 as an assembly or station-support mission rather than as a satellite engineering page, keeping the mission objective separate from the hardware-level ISS engineering record.

Flight and rendezvous

How the mission reached and worked at the station

STS-104 launched on July 12, 2001 using Space Shuttle Atlantis from Kennedy Space Center, Launch Pad 39B.

The mission used Canadarm2 to lift Quest from Atlantis and berth it to Unity while spacewalkers guided installation, connected heating and utility lines, and installed high-pressure oxygen and nitrogen tanks.

Hardware and assembly

What was delivered, installed, or reconfigured

Primary hardware or assembly focus: Quest Joint Airlock and high-pressure gas tanks.

Installation record: Quest attached to Unity on July 15, 2001. This is the engineering connection between the mission story and the interactive International Space Station breakdown.

Outcome

What changed on the International Space Station

Quest was activated and became the station's primary U.S. spacewalk airlock, enabling assembly and maintenance EVAs without depending on a docked Space Shuttle.

The documented result makes STS-104 part of the larger ISS assembly chain, where individual missions progressively added structure, power, laboratories, robotics, thermal control, logistics, and crew-support systems.